Required tools: Spade, Hammer, Hacksaw
(Edger/trencher - optional)
- Lay out area to be defined. A garden hose or string works
best.
- Spade a vertical wedge in ground approximately 4" deep.
- Begin placing edging in trench with the top 1/2" (12.5cm)
above what will become the compacted finish grade.
- Slide ends of edging strips together to connect pieces.
Installer can connect the adjacent section of edging prior to or
after the sections are placed in the trench. A minimum of 2 inches
(50.8mm) of overlap is recommended.
- Drive spikes through holes at a 45 degree angle. Start with
the beginning piece of edging.
- Stake and backfill edging continuously to ensure straight
lines, compacting both sides to ensure the finish grade is
approximately 1/2" below top of edging.
- Cut section to the desired length at the end of the bed
area.